Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dynamic stability of the left abutment in Xiaolangdi Project on the Yellow River
Dynamic stability of the left abutment in Xiaolangdi Project on the Yellow River
Dynamic stability of the left abutment in Xiaolangdi Project on the Yellow River
Wang, S. (Autor:in) / Xue, S. (Autor:in) / Maugeri, M. (Autor:in) / Motta, E. (Autor:in) / Pasamehmetoglu, A. G.
International symposium, Assessment and prevention of failure phenomena in rock engineering ; 1993 ; Istanbul; Turkey
01.01.1993
8 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Underground excavation in Xiaolangdi project in Yellow River
Online Contents | 2005
|Underground excavation in Xiaolangdi project in Yellow River
Tema Archiv | 2005
|Underground excavation in Xiaolangdi project in Yellow River
British Library Online Contents | 2004
|Underground excavation in Xiaolangdi project in Yellow River
Elsevier | 2004
|Progress at Xiaolangdi: China's key project on the Yellow river
Online Contents | 1998