Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Automated Case-Based Scheduling for Power Plant Boiler Erection: Use of Annotated Schedules
Automated Case-Based Scheduling for Power Plant Boiler Erection: Use of Annotated Schedules
Automated Case-Based Scheduling for Power Plant Boiler Erection: Use of Annotated Schedules
Tommelein, I. (Autor:in) / Dzeng, R.-J. (Autor:in) / Chamberlain, D. A. / International Association for Automation and Robotics in Construction
11th International symposium, Automation and robotics in construction XI ; 1994 ; Brighton
01.01.1994
8 pages
Aufsatz (Konferenz)
Englisch
automation , robotics , construction , ISARC , IAARC
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Boiler Erection Scheduling Using Product Models and Case-Based Reasoning
British Library Online Contents | 1997
|Boiler Erection Scheduling Using Product Models and Case-Based Reasoning
Online Contents | 1997
|