Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Additional Lagooning on Stage I of the Gale Common Ash Disposal Scheme: Investigation, Design and Preparatory Works
Additional Lagooning on Stage I of the Gale Common Ash Disposal Scheme: Investigation, Design and Preparatory Works
Additional Lagooning on Stage I of the Gale Common Ash Disposal Scheme: Investigation, Design and Preparatory Works
Martin, P. L. (Autor:in) / Vaciago, G. (Autor:in) / Somers, N. R. (Autor:in) / Burbidge, H. T. (Autor:in) / Carrier, W. D. / International Society for Soil Mechanics and Foundation Engineering / Canadian Geotechnical Society
1st International congress, Environmental geotechnics ; 1994 ; Edmonton; Canada
01.01.1994
6 pages
Also known as 1st ICEG
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Secondary liners at Gale Common ash disposal scheme NR Somers
British Library Online Contents | 2000
Shotcrete's Contribution to Gotthard Base Tunnel preparatory Works
British Library Online Contents | 2001
General report on Theme 1: Preparatory works and regular maintenance
British Library Conference Proceedings | 2003
|Preparatory works for the line 4 of the Budapest Metro network
British Library Conference Proceedings | 1997
|Online Contents | 1994