Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Increasing Arch Bridge Capacity Economically
Increasing Arch Bridge Capacity Economically
Increasing Arch Bridge Capacity Economically
Fairfield, C. A. (Autor:in) / Ponniah, D. A. (Autor:in) / Forde, M. C.
5th International conference, Vol 1; Extending the life of bridges ; 1993 ; Edinburgh
01.01.1993
8 pages
In 3 vols
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A method of increasing arch bridge capacity economically
British Library Online Contents | 1996
|Mobile carrier moves arch forms economically
Engineering Index Backfile | 1960
|METHOD OF INCREASING SPACE UNDER STONE ARCH BRIDGE AND STONE ARCH BRIDGE
Europäisches Patentamt | 2019
|Load Capacity of a Jack-Arch Bridge
NTIS | 1985
|Highest arch highway viaduct of striking appearance economically constructed
Engineering Index Backfile | 1916