Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Facilitate Delay Claim Analysis with As-Built Schedule Databases
Facilitate Delay Claim Analysis with As-Built Schedule Databases
Facilitate Delay Claim Analysis with As-Built Schedule Databases
1st Congress, Computing in civil engineering ; 1994 ; Washington; DC
01.01.1994
2104 pages
In 2 vols; Also known as I-CCCE; Held in conjunction with A/E/C Systems '94
Aufsatz (Konferenz)
Englisch
I-CCCE , computing , civil engineering , ASCE
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Built on schedule and below estimate
Engineering Index Backfile | 1942
Computerizing ICBF Method for Schedule Delay Analysis
Online Contents | 2011
|Computerizing ICBF Method for Schedule Delay Analysis
British Library Online Contents | 2011
|Delay Analysis Techniques and Claim Assessment in Construction Projects
BASE | 2023
|