Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Case Study in Building Commissioning and Savings Verification Applied to a 311,000 ft^2 Office Tower Retrofit
Case Study in Building Commissioning and Savings Verification Applied to a 311,000 ft^2 Office Tower Retrofit
Case Study in Building Commissioning and Savings Verification Applied to a 311,000 ft^2 Office Tower Retrofit
Reichmuth, H. S. (Autor:in) / Fish, K. C. (Autor:in) / American Council for an Energy Efficient Economy
8th Summer study, Vol 5; Commissioning, operation and maintenance ; 1994
01.01.1994
5.209-5.218
In 10 vols and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2011
|Building Commissioning: Ensuring Quality and Savings
ASCE | 2000
|Building Commissioning: Ensuring Quality and Savings
British Library Conference Proceedings | 2000
|Retrofit for a Large Office Building
British Library Online Contents | 1998
|