Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction and Removal of Piled Cofferdam
Construction and Removal of Piled Cofferdam
Construction and Removal of Piled Cofferdam
Umesh, P. (Autor:in) / Karunakar, R. D. P. (Autor:in) / Indian Geotechnical Society; Bombay Chapter
Indian geotechnical conference on advances in geotechnical engineering, IGC 90 ; 1990 ; Bombay; India
01.01.1990
6 pages
In 2 pts
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Design and performance of deep piled circular cofferdam
Tema Archiv | 1999
|Design and Performance of a Deep-Piled Circular Cofferdam
British Library Conference Proceedings | 1999
|Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|Heathrow Express rail link: design and construciton of deep piled circular cofferdam
British Library Conference Proceedings | 1998
|Adjustable cofferdam structure and cofferdam construction method
Europäisches Patentamt | 2023
|