Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Convex-hull algorithm for construction schedule time/cost trade-off decision
Convex-hull algorithm for construction schedule time/cost trade-off decision
Convex-hull algorithm for construction schedule time/cost trade-off decision
Burns, S. A. (Autor:in) / Liu, L. Y. (Autor:in) / Feng, C.-W. (Autor:in) / Pahl, P. J. / Werner, H. / Arbeitskreis Bauinformatik| Technologie-Vermittlungs-Agentur Berlin e.V.
6th International conference, Computing in civil and building engineering ; 1995 ; Berlin
01.01.1995
8 pages
2; vols; Also known as VI-ICCCBE
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Uncertain Time-Resource-Cost Trade-Off Models for Construction Project Schedule
Springer Verlag | 2021
|Automated BIM schedule generation approach for solving time–cost trade-off problems
Emerald Group Publishing | 2021
|Optimal Construction for Time-Convex Hull with Two Orthogonal Highways in the L1-metric
ArXiv | 2021
|Maglev Guideway Cost and Construction Schedule Assessment
Online Contents | 1997
|