Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Remedial works to stabilize the upstream portal of the Alhandra Tunnel
Remedial works to stabilize the upstream portal of the Alhandra Tunnel
Remedial works to stabilize the upstream portal of the Alhandra Tunnel
Tocha Santos, J. (Autor:in) / Fernandes, J. C. G. (Autor:in) / International Association of Engineering Geology
International symposium, Engineering geology and underground construction ; 1983 ; Lisbon
Engineering geology and underground construction ; III.105-III.116
01.01.1984
III.105-III.116
3; vols; In English and French
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Remedial works to upstream face protection, Megget Reservoir
British Library Conference Proceedings | 1998
|Remedial works in the Karavanke tunnel
British Library Conference Proceedings | 1998
|TUNNEL PORTAL INSTABILITY IN LANDSLIDE AREA AND REMEDIAL SOLUTION: A CASE STUDY
BASE | 2019
|ASCE | 2017
|