Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of the "Passante Ferroviario" Link in Milano, Lots 3P - 5P - 6P Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection
Construction of the "Passante Ferroviario" Link in Milano, Lots 3P - 5P - 6P Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection
Construction of the "Passante Ferroviario" Link in Milano, Lots 3P - 5P - 6P Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection
Marcheselli, P. (Autor:in) / Peron, J.-Y. (Autor:in) / Williamson, G. E. / Gowring, I. M.
12th Rapid excavation and tunneling conference ; 1995 ; San Francisco; CA
01.01.1995
26 pages
Also known as RETC 12
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 1994
|Milano: Passante Ferroviario, stazione Lancetti
Online Contents | 2001
Stability of excavation face in earth pressure balanced shield
British Library Conference Proceedings | 1995
|Earth Pressure Balanced Shield Tunneling
ASCE | 2021
|British Library Conference Proceedings | 2001
|