Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Seepage Cutoff Wall Design and Construction in Mud Mountain Dam
Seepage Cutoff Wall Design and Construction in Mud Mountain Dam
Seepage Cutoff Wall Design and Construction in Mud Mountain Dam
Graybeal, K. D. (Autor:in) / Association of State Dam Safety Officials
8th Annual conference ; 1991 ; San Diego; CA
01.01.1991
17 pages
2; pts
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Evolution of USACE Seepage Cutoff Wall Contracts
ASCE | 2017
|Investigation of cutoff wall location in steady axisymmetric seepage
Elsevier | 2024
|