Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
Annual meeting; 22nd, American Society of Civil Engineers: Integrated water resources planning for the 21st century ; 1995 ; Cambridge; MA
01.01.1995
4 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Case Study: Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
British Library Conference Proceedings | 1995
|Four Years Later, Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
British Library Conference Proceedings | 1998
|Evaluation of bendway weir bank stabilization techniques for stream restoration
Online Contents | 2012
|Evaluation of bendway weir bank stabilization techniques for stream restoration
Taylor & Francis Verlag | 2012
|Bendway Weir Riprap Sizing Criteria
ASCE | 2016
|