Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Learning/Forgetting Curve Effects in Estimating Realistic Project Durations
Learning/Forgetting Curve Effects in Estimating Realistic Project Durations
Learning/Forgetting Curve Effects in Estimating Realistic Project Durations
Kumar Saha, S. (Autor:in) / Wakefield, R. R. (Autor:in) / Carmichael, D. G. (Autor:in) / Loo, Y.-C. / Griffith University; Faculty of Engineering and Applied Science
East Asia-Pacific conference; 5th, Structural engineering and construction: Building for the 21st century ; 1995 ; Gold Coast; Australia
01.01.1995
6 pages
Also know as EASEC - 5
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
General framework for designing multi-use simulation modules for estimating project durations
Online Contents | 2011
|General framework for designing multi-use simulation modules for estimating project durations
Emerald Group Publishing | 2011
|General framework for designing multi-use simulation modules for estimating project durations
British Library Online Contents | 2011
|Approximate Risk Function for Project Durations
Springer Verlag | 2019
|Risk Modeling of Dependence among Project Task Durations
Wiley | 2007
|