Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ground movements and vertical compensation grouting during shaft construction - Jubilee Line Extension, Green Park Station, Contract 101
Ground movements and vertical compensation grouting during shaft construction - Jubilee Line Extension, Green Park Station, Contract 101
Ground movements and vertical compensation grouting during shaft construction - Jubilee Line Extension, Green Park Station, Contract 101
Murugamoorthy, C. (Autor:in) / Murray, G. S. (Autor:in) / Ball, P. (Autor:in) / Bracegirdle, A. (Autor:in) / Mair, R. J. / Taylor, R. N. / International Society for Soil Mechanics and Foundation Engineering; Technical Committee TC28 on Underground Construction in Soft Ground
International symposium, Geotechnical aspects of underground construction in soft ground ; 1996 ; London
01.01.1996
6 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2003
|The new Jubilee Line Extension in London Compensation grouting
Online Contents | 1997
|The new Jubilee Line Extension in London Compensation grouting
British Library Online Contents | 1997
|British Library Conference Proceedings | 1996
|