Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experience with large underground caverns under high primary stress at the Ertan Hydropower Plant, China
Experience with large underground caverns under high primary stress at the Ertan Hydropower Plant, China
Experience with large underground caverns under high primary stress at the Ertan Hydropower Plant, China
Schubert, E. (Autor:in) / Zeisel, L. (Autor:in) / Golser, J. / Hinkel, W. J. / Schubert, W. / International Tunnelling Association
World tunnel congress, Tunnels for people ; 1997 ; Vienna
01.01.1997
6 pages
Held in conjunction with the 23rd General assembly of the International Tunnelling Association
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Study on resources exploitation and sustainable development at Ertan Hydropower Plant
British Library Conference Proceedings | 2000
|Numerical Modelling of Underground Caverns in Hydropower Projects
British Library Conference Proceedings | 1997
|Underground power report on the construction of the Ertan Hydroelectric Power Plant in China
British Library Online Contents | 2001
|