Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
An introduction to the construction of Headrace Tunnel by TBM in Shihlin Hydropower Project
An introduction to the construction of Headrace Tunnel by TBM in Shihlin Hydropower Project
An introduction to the construction of Headrace Tunnel by TBM in Shihlin Hydropower Project
Fu, C.-C. (Autor:in) / Chen, T.-H. (Autor:in) / Hsiao, T.-H. (Autor:in) / Yuan, J.-X.
International conference; 9th, Computer methods and advances in geomechanics ; 1997 ; Wuhan; China
01.01.1997
6 pages
Vols 1-3 of 4 vol set only rec'd. Also known as IACMAG 97; Another set still on order
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Headrace tunnel of the El Alto hydropower project in Panama
Tema Archiv | 2013
|DOAJ | 2023
|Approaches to Reduce Friction Losses in Headrace Waterways of Hydropower Plants
Online Contents | 2016
|