Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Short Payback Period of Turbine Control and Monitoring Systems for Low Head Power Stations
Short Payback Period of Turbine Control and Monitoring Systems for Low Head Power Stations
Short Payback Period of Turbine Control and Monitoring Systems for Low Head Power Stations
Huser, L. (Autor:in) / Meier, C. (Autor:in) / Mahoney, D. J.
International conference, Hydropower: Waterpower '97; proceedings of the international conference on hydropower ; 1997 ; Atlanta; GA
01.01.1997
10 pages
Also known as WP '97; See also 4342.950 vol 16 no 4 1997 for selected papers
Aufsatz (Konferenz)
Englisch
hydropower , waterpower , WP
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
การวิเคราะห์ระยะเวลาคืนทุนต้นแบบโรงงานรีไซเคิลคอนกรีต: Payback Period of a Concrete Recycling Plant
BASE | 2023
|DOAJ | 2019
|Energy Saving and Payback Period for Retrofitting of Lighting Systems in Taiwan
British Library Conference Proceedings | 2011
|Low-maintenance systems for heat recovery with short payback periods
British Library Online Contents | 2004
|Model of evaluating the projected payback period in energy preservation
DOAJ | 2015
|