Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Molhe Oeste do Porto de Sines: Reabilitacao Definitiva Fiscalizacao da Construcao
Molhe Oeste do Porto de Sines: Reabilitacao Definitiva Fiscalizacao da Construcao
Molhe Oeste do Porto de Sines: Reabilitacao Definitiva Fiscalizacao da Construcao
Seminar, Reconstruction of the west breakwater at Port Sines, Portugal: prepared by the Rubble Mound Structures Committee of the Waterway, Port, Coastal &Ocean Division of the American Society of Civil Engineers; with the cooperation of administracao do Porto de Sines, Sines, Portugal ; 1993 ; Sines; Portugal
01.01.1994
36 pages
Text in English or Portuguese
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Proteccao Provisoria do Molhe Oeste do Porto de Sines
British Library Conference Proceedings | 1994
|La sistemazione ideale e definitiva del tetto
Tema Archiv | 1982
|