Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and Construction Aspects of the PCCP Water Main Rehabilitation
Design and Construction Aspects of the PCCP Water Main Rehabilitation
Design and Construction Aspects of the PCCP Water Main Rehabilitation
Khondker, S. A. (Autor:in) / Mitchell, J. R. (Autor:in) / Castronovo, J. P. / Clark, J. A. / American Society of Civil Engineers; Pipeline Division
Conference, American Society of Civil Engineers: Pipeline Division ; 1998 ; San Diego; CA
01.01.1998
10 pages
Held in conjunction with the Prestressed concrete cylinder pipe (PCCP) users' forum
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Rehabilitation of a 72-Inch PCCP Transmission Main in Phoenix, AZ
British Library Conference Proceedings | 2006
|PCCP Rehabilitation Using Retrofitted Dowel Bars
British Library Conference Proceedings | 1995
|