Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geotechnical Challenges Faced on Line 2 of the Greater Cairo Metro System
Geotechnical Challenges Faced on Line 2 of the Greater Cairo Metro System
Geotechnical Challenges Faced on Line 2 of the Greater Cairo Metro System
Campo, D. W. (Autor:in) / Richards, D. P. (Autor:in) / Lambrechts, J. R. / Hwang, R. / Urzua, A. / American Society of Civil Engineers; Geo-Institute
Session, Big digs around the world ; 1998 ; Boston; MA
01.01.1998
22 pages
Held as part of the ASCE geo-congress 98
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Special Geotechnical Works for Metro Cairo (Egypt)
Springer Verlag | 2023
|Twin tunnel configuration for Greater Cairo metro line No. 4
Online Contents | 2015
|Twin tunnel configuration for Greater Cairo metro line No. 4
Elsevier | 2015
|Seismic hazards for Greater Cairo underground metro lines
British Library Conference Proceedings | 1994
|CAIRO METRO Planning ahead in Cairo
Online Contents | 2011