Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Toe Penetration Requirements for Tieback Walls
Toe Penetration Requirements for Tieback Walls
Toe Penetration Requirements for Tieback Walls
Mueller, C. G. (Autor:in) / Long, J. H. (Autor:in) / Cording, E. J. (Autor:in) / Fernandez, G. / Bauer, R. A. / American Society of Civil Engineers
Conference; 3rd, Geo-engineering for underground facilities ; 1999 ; Urbana-Champaign, IL
01.01.1999
12 pages
Includes bibliographical references
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Beam-Column Method for Tieback Walls
Online Contents | 1998
|Tieback Supported Walls in Urban Environment
British Library Conference Proceedings | 1988
|Beam-Column Method for Tieback Walls
British Library Online Contents | 1998
|DISCUSSIONS - Beam-Column Method for Tieback Walls
Online Contents | 1999
|Design and Behavior of One-Tier Tieback Walls
British Library Conference Proceedings | 1999
|