Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation Remediation for a Three-Story Structure on an Uncontrolled Fill Site: A Case History
Foundation Remediation for a Three-Story Structure on an Uncontrolled Fill Site: A Case History
Foundation Remediation for a Three-Story Structure on an Uncontrolled Fill Site: A Case History
Congress; 2nd, Forensic engineering ; 2000 ; San Juan, P.R
Forensic engineering ; 600-606
01.01.2000
7 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Forensic Analysis of an Uncontrolled Fill 7.13
British Library Conference Proceedings | 2004
|Settlement of Shallow Foundations on Uncontrolled Mine Spoil Fill
Online Contents | 1996
|Settlement of Shallow Foundations on Uncontrolled Mine Spoil Fill
British Library Online Contents | 1996
|Lightweight fill in dam remediation - a case study
British Library Conference Proceedings | 2006
|