Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BHP Iron Ore Capacity Expansion Project, Design and Construction of No. 3 Car Dumper, Nelson Point, Port Hedland
BHP Iron Ore Capacity Expansion Project, Design and Construction of No. 3 Car Dumper, Nelson Point, Port Hedland
BHP Iron Ore Capacity Expansion Project, Design and Construction of No. 3 Car Dumper, Nelson Point, Port Hedland
Russell, S. (Autor:in) / Kinder, D. (Autor:in) / Kidd, P. (Autor:in) / Baweja, D. / Concrete Institute of Australia
Biennial conference; 19th, Concrete Institute of Australia; Concrete 99 ; 1999 ; Sydney, Australia
01.01.1999
12 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Fortescue wins towage license at Port Hedland
Online Contents | 2016
Online Contents | 2009
Online Contents | 1996