Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cost Effective Method of Clinker Quality Upgradation - A Case Study
Cost Effective Method of Clinker Quality Upgradation - A Case Study
Cost Effective Method of Clinker Quality Upgradation - A Case Study
Dasgupta, R. (Autor:in) / Babu, K. V. S. (Autor:in) / Deveshwar, U. C. (Autor:in) / National Council for Cement and Building Materials
7th, NCB international seminar on cement and building materials ; 2000 ; New Delhi
01.01.2000
XII-13-XII-21
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Upgradation of Madras Cements Ltd, Alathiyur - A Case Study
British Library Conference Proceedings | 2000
|Comparative Study of Upgradation of Highways
British Library Online Contents | 2011
|Effective Clinker Replacement Using SCM in Low Clinker Cements
Springer Verlag | 2015
|Upgradation of Zuari Cement Plant
British Library Conference Proceedings | 2000
|Method of determining clinker quality
Engineering Index Backfile | 1936
|