Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Treatment of Time-related Costs in Tunnelling Contracts
Treatment of Time-related Costs in Tunnelling Contracts
Treatment of Time-related Costs in Tunnelling Contracts
Vigl, L. (Autor:in) / Varma, C. V. J. / Rao, A. R. G. / Central Board of Irrigation and Power VOL 2
Workshop, Austrian hydel power construction methodology ; 1998 ; New Delhi
01.01.1998
6 pages
Theme title is "Hydro projects in the Himalayas"
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Treatment of time-related costs in tunneling contracts
British Library Conference Proceedings | 1997
|TIBKAT | 1985
|Risk and Claims in Tunnelling Contracts
British Library Conference Proceedings | 1997
|Recommendations for Sharing Risks in Tunnelling Contracts
British Library Online Contents | 1998
|Insurance Covers to Be Considered for Tunnelling Contracts
British Library Conference Proceedings | 1991
|