Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bored pile-jet grout foundation in limestone contact zone
Bored pile-jet grout foundation in limestone contact zone
Bored pile-jet grout foundation in limestone contact zone
Toh, C. T. (Autor:in) / Chee, S. K. (Autor:in) / Lee, S. L. (Autor:in) / Rathmayer, H. / Finnish Geotechnical Society
International conference; 4th, Ground improvement geosystems; Grouting soil improvement ; 2000 ; Helsinki
01.01.2000
8 pages
Also known as GIGS; See also m01/22407 for keynote lectures
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Grout, the foundation bored tunnel
British Library Conference Proceedings | 2003
|Engineering Index Backfile | 1952
Construction method for bored pile foundation, combined steel casing and bored pile foundation
Europäisches Patentamt | 2023
|Compacted grout bored micropiles in clay
British Library Conference Proceedings | 2003
|