Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fully Instrumented and Monitored Metro Construction in Shanghai
Fully Instrumented and Monitored Metro Construction in Shanghai
Fully Instrumented and Monitored Metro Construction in Shanghai
Wang, J. G. Z. Q. (Autor:in) / Hong Kong Institution of Engineers
Seminar, Instrumentation in geotechnical engineering ; 1995 ; Hong Kong
01.01.1995
18 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Design and Construction of Excavation for Shanghai Metro
British Library Conference Proceedings | 1998
|Application of AGF to Shanghai Metro 1^# line construction
British Library Conference Proceedings | 1997
|Shanghai builds two new metro lines
British Library Online Contents | 1998
Shanghai to build second metro line
British Library Online Contents | 1996
Ground Response to the Construction of Shanghai Metro Tunnel-Line 2
British Library Online Contents | 1999
|