Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimum Resource Utilization for Bidding on a Cost and Time Highway Construction Contract
Optimum Resource Utilization for Bidding on a Cost and Time Highway Construction Contract
Optimum Resource Utilization for Bidding on a Cost and Time Highway Construction Contract
El-Rayes, K. (Autor:in) / Moselhi, O. (Autor:in) / Moselhi, O. / Bedard, C. / Alkass, S. / Canadian Society for Civil Engineering
3rd, Canadian conference on computing in civil and building engineering ; 1996 ; Montreal, Canada
01.01.1996
10 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimum Planning of Highway Construction under A + B Bidding Method
British Library Online Contents | 2001
|Optimum Planning of Highway Construction under A + B Bidding Method
Online Contents | 2001
|Executive Information System for Construction Contract Bidding Decisions
British Library Conference Proceedings | 1993
|Setting Highway Construction Contract Duration
ASCE | 2021
|