Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development and On-Site Introduction of Super Long Distance Pipe-Jacking Method (Double-Layer Injection Method)
Development and On-Site Introduction of Super Long Distance Pipe-Jacking Method (Double-Layer Injection Method)
Development and On-Site Introduction of Super Long Distance Pipe-Jacking Method (Double-Layer Injection Method)
Conference; 18th, International NO-DIG ; 2000 ; Perth, Australia
01.01.2000
9 pages
Theme title: Underground space technology: the hole solution
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Super Long Distance Jacking Method
British Library Conference Proceedings | 1997
|Development of A New Pipe Jacking Method for ULTRA-LONG Distance
British Library Conference Proceedings | 1997
|Long-distance pipe jacking construction method for urban underground pipe gallery
Europäisches Patentamt | 2021
|Long Distance Concrete Pipe Jacking Technique & Engineering Application
British Library Conference Proceedings | 1997
|Automatic Guidance System for Long-Distance Curved Pipe-Jacking
Springer Verlag | 2020
|