Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dam-valley risk management. First results of a case study in Portugal - Arade valley
Dam-valley risk management. First results of a case study in Portugal - Arade valley
Dam-valley risk management. First results of a case study in Portugal - Arade valley
de Almeida, A. B. (Autor:in) / Franco, A. B. (Autor:in) / Ramos, C. M. (Autor:in) / Santos, M. A. (Autor:in) / Viseu, T. (Autor:in) / Silva, D. (Autor:in) / International Commission on Large Dams
International congress; 20th, Large dams; Vingtieme congres international des grands barrages ; 2000 ; Beijing
01.01.2000
22 pages
Text in English or French, summaries in English and French
Aufsatz (Konferenz)
Englisch
large dams , grands barrages , barrages , dams , ICOLD , CIGB
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Innovations in Sustainable Agriculture: Case Study of Lis Valley Irrigation District, Portugal
DOAJ | 2019
|Structures in Portugal - Bridge over the Corgo River Valley
Online Contents | 2005
|AUTOMATIC VALLEY PARKING MANAGEMENT SYSTEM AND AUTOMATIC VALLEY PARKING MANAGEMENT METHOD
Europäisches Patentamt | 2022
|Ceylon's first river valley project
Engineering Index Backfile | 1954
|