Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Monitoring systems of Salto Caxias hydroelectric powerplant after one year of filling of reservoir
Monitoring systems of Salto Caxias hydroelectric powerplant after one year of filling of reservoir
Monitoring systems of Salto Caxias hydroelectric powerplant after one year of filling of reservoir
Mussi, J. M. P. (Autor:in) / Orlowski, E. A. G. (Autor:in) / International Commission on Large Dams
International congress; 20th, Large dams; Vingtieme congres international des grands barrages ; 2000 ; Beijing
01.01.2000
16 pages
Text in English or French, summaries in English and French
Aufsatz (Konferenz)
Englisch
large dams , grands barrages , barrages , dams , ICOLD , CIGB
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
RCC TECHNOLOGY - Salto Caxias: Brazil's largest RCC dam
Online Contents | 1999
|Seepage and treatment of cracks in Salto Caxias dam
British Library Conference Proceedings | 2003
|PENSTOCKS - Installing ultrasonic flowmeters on the large diameter Salto Caxias penstocks
Online Contents | 1999
|Shawinigan hydroelectric complex: powerplant rehabilitation
British Library Conference Proceedings | 1993
|Online Contents | 2003