Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Intake Shaft Construction on the Lake Mead Project
Intake Shaft Construction on the Lake Mead Project
Intake Shaft Construction on the Lake Mead Project
Ishii, D. (Autor:in) / Morris, J. (Autor:in) / Hilton, D. E. / Samuelson, K.
Rapid excavation and tunneling conference ; 1999 ; Orlando, FL
01.01.1999
8 pages
Also known as RETC 1999
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Lake Mead Underwater Intake Structure and Tunnel Connection-Lake Mead Intake No. 3 Tunnel Project
British Library Conference Proceedings | 2011
|Intake tunnel construction at Lake Mead
British Library Conference Proceedings | 2000
|British Library Online Contents | 2009
|Project Delivery Selection for Southern Nevada's Lake Mead Intake No. 3
British Library Conference Proceedings | 2009
|Geotechnical Exploration for a Lake Mead Intake
British Library Conference Proceedings | 1997
|