Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Gotthard Base Tunnel. TBM Heading Equipment Requirements
Gotthard Base Tunnel. TBM Heading Equipment Requirements
Gotthard Base Tunnel. TBM Heading Equipment Requirements
Amberg, F. (Autor:in) / Teuscher, P. / Colombo, A. / Swiss Tunnelling Society / Societa Italiana Gallerie
AITES-ITA World tunnel congress ; 2001 ; Milan, Italy
AITES-ITA World tunnel congress ; 11-18
01.01.2001
8 pages
Aufsatz (Konferenz)
Englisch
tunnel , AITES , ITA , STS , tunnelling
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Planning the Gotthard base tunnel
Online Contents | 1993
|Gotthard base tunnel: Sedrun section
British Library Online Contents | 1999
|Gotthard Base Tunnel, Erstfeld section
British Library Online Contents | 2011
|Gotthard Base Tunnel-Structure and Environment
British Library Online Contents | 1997
Gotthard Base Tunnel. A Special Challenge
British Library Conference Proceedings | 2001
|