Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geomembrane cutoff wall installation utilizing a narrow trench technique
Geomembrane cutoff wall installation utilizing a narrow trench technique
Geomembrane cutoff wall installation utilizing a narrow trench technique
Wilson, F. (Autor:in) / Janssens, J. (Autor:in) / Delmas, P. / Gourc, J.-P. / Girard, H.
International conference; 7th, Geosynthetics; state of the art recent developments ; 2002 ; Nice, France
01.01.2002
6 pages
See also same s/m for a copy of CD-ROM containing papers. Shelved in Conference Index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Geomembrane Installation Factors
Wiley | 2009
|Soil-Bentonite Slurry Trench Cutoff Wall Longevity
British Library Conference Proceedings | 2018
|Stresses in Soil-Bentonite Slurry Trench Cutoff Wall
ASCE | 2019
|Stresses in Soil-Bentonite Slurry Trench Cutoff Wall
British Library Conference Proceedings | 2019
|Stresses in Soil-Bentonite Slurry Trench Cutoff Wall
TIBKAT | 2019
|