Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Foot over Bridge (F.O.B) using Precast prestressed Concrete Members
Construction of Foot over Bridge (F.O.B) using Precast prestressed Concrete Members
Construction of Foot over Bridge (F.O.B) using Precast prestressed Concrete Members
National conference, Advances and innovations in bridge engineering ; 1999 ; Madras, India
01.01.1999
14 pages
Also known as AIB'99
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Precast prestressed concrete rail bridge
Engineering Index Backfile | 1947
Precast prestressed concrete rail bridge
Engineering Index Backfile | 1947
Precast, prestressed concrete members in Tampa Bay toll bridge project
Engineering Index Backfile | 1953
Prestressed concrete bridge built at Ager (Austria) from large precast members
Engineering Index Backfile | 1963
|Precast prestressed lightweight concrete construction
Engineering Index Backfile | 1955
|