Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Evaluation, Rehabilitation, and Replacement of the 50-Year-Old Upper Jones Falls Interceptor
Evaluation, Rehabilitation, and Replacement of the 50-Year-Old Upper Jones Falls Interceptor
Evaluation, Rehabilitation, and Replacement of the 50-Year-Old Upper Jones Falls Interceptor
Lake, G. C. (Autor:in) / Benson, C. A. (Autor:in) / Wyatt, G. A. (Autor:in) / Qadri, W. (Autor:in) / Najafi, M. / American Society of Civil Engineers
ASCE international conference on pipeline engineering and construction; New pipeline technologies, security, and safety ; 2003 ; Baltimore, MD
01.01.2003
9 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Completion of a Fourteen-Year Rock Tunnel Interceptor Rehabilitation Project
British Library Conference Proceedings | 2012
|Jones falls conduits, Baltimore
Engineering Index Backfile | 1911
Improving Capacity Through Sewer Replacement: Potomac Interceptor Project
British Library Conference Proceedings | 2012
|