Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge Deck Replacement Strategies and Life-Cycle Cost Analyses Under Multiple Limit States
Bridge Deck Replacement Strategies and Life-Cycle Cost Analyses Under Multiple Limit States
Bridge Deck Replacement Strategies and Life-Cycle Cost Analyses Under Multiple Limit States
Stewart, M. G. (Autor:in) / Estes, A. C. (Autor:in) / Frangopol, D. M. (Autor:in) / Casas, J. R. / Frangopol, D. M. / Nowak, A. S. / International Association for Bridge Maintenance and Safety
International conference; 1st, Bridge maintenance, safety and management; , IABMAS'02 ; 2002 ; Barcelona, Spain
01.01.2002
2 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Bridge Deck Replacement for Minimum Expected Cost Under Multiple Reliability Constraints
British Library Online Contents | 2004
|Bridge Deck Replacement for Minimum Expected Cost Under Multiple Reliability Constraints
Online Contents | 2004
|Bridge Deck Management System with Integrated Life-Cycle Cost Optimization
British Library Online Contents | 2004
|Bridge deck replacement with lightweight exodermic bridge deck panels
British Library Conference Proceedings | 2000
|