Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stability analysis for bench stoping in the Hishikari gold mine, Japan, by using numerical approach
Stability analysis for bench stoping in the Hishikari gold mine, Japan, by using numerical approach
Stability analysis for bench stoping in the Hishikari gold mine, Japan, by using numerical approach
Sagawa, Y. (Autor:in) / Mae, K. (Autor:in) / Maeda, T. (Autor:in) / Yamatomi, J. (Autor:in) / Sugawara, K. / Obara, Y. / Sato, A. / Society of Rock Engineering / Japan Society for Rock Mechanics and Mining / Materials Processing Institute of Japan
3rd, International symposium on rock stress ; 2003 ; Kumamoto, Japan
01.01.2003
8 pages
Also known as RS Kumamoto '03
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Asia: Sumitomo Will Develop New Orebody at Hishikari Gold Mine
Online Contents | 2012
Invisible gold and arsenic in pyrite from the high-grade Hishikari gold deposit, Japan
British Library Online Contents | 2008
|Safety analysis of Sormeh underground mine to improve sublevel stoping stability
Wiley | 2023
|Safety analysis of Sormeh underground mine to improve sublevel stoping stability
Wiley | 2023
|Safety analysis of Sormeh underground mine to improve sublevel stoping stability
DOAJ | 2023
|