Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete Patch Repairs: Time for a Risk-based Strategy?
Concrete Patch Repairs: Time for a Risk-based Strategy?
Concrete Patch Repairs: Time for a Risk-based Strategy?
Canisius, T. D. G. (Autor:in) / Waleed, N. (Autor:in) / Japan Prestressed Concrete Engineering Association / Nihon Konkurito Kogaku Kyokai
1st:; CONGRESS, Fib ; 2002 ; Osaka, Japan
Fib ; 12-43-12-44
01.01.2002
32 pages
VOL 2 OF 8
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Concrete Patch Repairs: Time for a Risk-based Strategy?
British Library Conference Proceedings | 2002
|Long term evaluation of concrete patch repairs
British Library Conference Proceedings | 2009
|Concrete patch repairs under propped and unpropped implementation
Online Contents | 2004
|The pull-off test for concrete patch repairs
British Library Online Contents | 1997
|Development of patch test to study behaviour of shallow concrete patch repairs.
Online Contents | 1993
|