Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Considerations for Baselining Groundwater Conditions for Tunneling Projects
Considerations for Baselining Groundwater Conditions for Tunneling Projects
Considerations for Baselining Groundwater Conditions for Tunneling Projects
Hunt, S. W. (Autor:in) / Lamb, I. (Autor:in) / Fradkin, S. B. (Autor:in) / Hutton, J. D. / Rogstad, W. D. / Society of Mining, Metallurgy and Exploration
17th, Rapid excavation and tunneling conference ; 2005 ; Seattle, WA
01.01.2005
11 pages
Also known as RETC
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Characterizing and Baselining Faults for Tunneling
British Library Conference Proceedings | 2015
|The Fremont Siphon Replacement Project: A Hybrid Approach to Baselining Microtunnel Projects
British Library Conference Proceedings | 2020
|Identifying and baselining boulders for underground construction
Tema Archiv | 1999
|