Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Parbati Hydroelectric Project Stage II, India-Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBM
Parbati Hydroelectric Project Stage II, India-Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBM
Parbati Hydroelectric Project Stage II, India-Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBM
17th, Rapid excavation and tunneling conference ; 2005 ; Seattle, WA
01.01.2005
13 pages
Also known as RETC
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Parbati hydroelectric project - a crown jewel of NHPC
British Library Online Contents | 2005
Construction planning of dam and fossil valley treatment at Parbati hydroelectric project, stage II
British Library Online Contents | 2005
|