Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Variation in Sediment Transport in the Jingjiang River During the Initial Impounding Period of the Three Gorges Project
Variation in Sediment Transport in the Jingjiang River During the Initial Impounding Period of the Three Gorges Project
Variation in Sediment Transport in the Jingjiang River During the Initial Impounding Period of the Three Gorges Project
9th:; International Symposium, River sedimentation; interactions between fluvial systems and hydraulic projects and pertinent environmental impacts ; 2004 ; Yichang, China
01.01.2004
6 pages
See also 6846.847001V for papers held on CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2004
|HENRY – Bundesanstalt für Wasserbau (BAW) | 2012
|Evaluating Regime Change of Sediment Transport in the Jingjiang River Reach, Yangtze River, China
DOAJ | 2018
|British Library Online Contents | 2003
|A Study on Optimization of Limited Water Level and Water Impounding Time of Three Gorges Project
HENRY – Bundesanstalt für Wasserbau (BAW) | 2008
|