Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Three-Dimensional Displacement Computation and Construction Pre-Control of Foundation Pit in Deping Station of Shanghai Track Traffic Line 6 Project
Three-Dimensional Displacement Computation and Construction Pre-Control of Foundation Pit in Deping Station of Shanghai Track Traffic Line 6 Project
Three-Dimensional Displacement Computation and Construction Pre-Control of Foundation Pit in Deping Station of Shanghai Track Traffic Line 6 Project
Chen, Y. L. (Autor:in) / Azzam, R. (Autor:in) / Zhang, F. B. (Autor:in) / Zhu, Hehua
Session, Underground construction and ground movement ; 2006 ; Shanghai, China
01.01.2006
8 pages
Held as part of the GeoShanghai international conference.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2006
|Track traffic comprehensive hub project foundation settlement testing device
Europäisches Patentamt | 2024
|Risk Assessment Methodology for a Deep Foundation Pit Construction Project in Shanghai, China
British Library Online Contents | 2011
|