Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A GA-BASED BORROWING STRATEGY FOR CONSTRUCTION SMES IN HONG KONG
A GA-BASED BORROWING STRATEGY FOR CONSTRUCTION SMES IN HONG KONG
A GA-BASED BORROWING STRATEGY FOR CONSTRUCTION SMES IN HONG KONG
Tang, C. M. (Autor:in) / Wong, C. W. Y. (Autor:in) / Leung, A. Y. T. (Autor:in) / KC. Lam, C. (Autor:in) / Association of Researchers in Construction Management
Conference, Association of Researchers in Construction Management:; ARCOM twenty-first annual conference 2005 ; 2005 ; London, England
01.01.2005
14 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Selection of funding schemes by a borrowing decision model: a Hong Kong case study
British Library Online Contents | 2006
|Selection of funding schemes by a borrowing decision model: a Hong Kong case study
Online Contents | 2006
|Selection of funding schemes by a borrowing decision model: a Hong Kong case study
Online Contents | 2006
|Hong Kong International Airport - construction
British Library Online Contents | 1998
|Construction dewatering in Hong Kong
British Library Conference Proceedings | 1997
|