Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Efficient Computation for a Complex Tunnel Excavation Problem
Efficient Computation for a Complex Tunnel Excavation Problem
Efficient Computation for a Complex Tunnel Excavation Problem
Hsieh, Y.-M. (Autor:in) / Whittle, A. J. (Autor:in) / DeGroot, D. J. / American Society of Civil Engineers
GeoCongress; geotechnical engineering in the information technology age ; 2006 ; Atlanta, GA
01.01.2006
P183
HELD ON CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Tunnel complex unloaded by a deep excavation
Online Contents | 2001
|Engineering Index Backfile | 1941
|Complex Variable Solution for a Tunnel Excavation Problem by Considering Lining Inner Pressure
British Library Conference Proceedings | 2014
|