Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Funil and Porto Estrela hydropower plants: technical solutions adopted for reducing construction time
Funil and Porto Estrela hydropower plants: technical solutions adopted for reducing construction time
Funil and Porto Estrela hydropower plants: technical solutions adopted for reducing construction time
Raouf Shaat, M. A. (Autor:in) / Caceres Caceres, L. M. (Autor:in) / Ferreira Leite, J. E. (Autor:in) / International Commission on Large Dams
22nd, Congress on large dams ; 2006 ; Barcelona, Spain
01.01.2006
22 pages
Text in English or French.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
DOAJ | 2010
|Technical solutions adopted in construction of Aswan High Dam
British Library Conference Proceedings | 2006
|Tema Archiv | 1976
|World hydropower and hydropower construction
Online Contents | 1970
|World hydropower and hydropower construction
Online Contents | 1977
|