Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A new quadratic assigment model for optimizing facility layout in dam construction site
A new quadratic assigment model for optimizing facility layout in dam construction site
A new quadratic assigment model for optimizing facility layout in dam construction site
Forsatkar, E. (Autor:in) / International Commission on Large Dams
22nd, Congress on large dams ; 2006 ; Barcelona, Spain
01.01.2006
12 pages
Text in English or French.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Traffic assigment and trip distribution
Elsevier | 1989
Assigment of the initial technological parameters of grouting construction joints of concrete dams
Online Contents | 1996
|Assigment of the initial technological parameters of grouting construction joints of concrete dams
Springer Verlag | 1996
|Probabilistic Fire Risk Framework for Optimizing Construction Site Layout
DOAJ | 2020
|BIM-based framework for temporary facility layout planning in construction site
Emerald Group Publishing | 2019
|