Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project
Redmond, S. (Autor:in) / Tattersall, C. (Autor:in) / Garavelli, N. (Autor:in) / Kudo, T. (Autor:in) / Raleigh, P. (Autor:in) / Lehnen, M.J. (Autor:in) / Traylor, M.T. / Townsend, J.W. / Society for Mining, Metallurgy, and Exploration (U.S.)
Rapid excavation and tunneling conference ; 2007 ; Toronto, Canada
01.01.2007
15 pages
Also known as RETC. Held on CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2007
|Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels
British Library Conference Proceedings | 2005
|Engineering Index Backfile | 1940
|Use of FLAC^3^D on Beacon Hill Station and Tunnels project in Seattle, Washington
British Library Conference Proceedings | 2006
|British Library Online Contents | 1998
|