Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3
Oginski, S. (Autor:in) / Finn, P. (Autor:in) / Ding, Y. (Autor:in) / Traylor, M.T. / Townsend, J.W. / Society for Mining, Metallurgy, and Exploration (U.S.)
Rapid excavation and tunneling conference ; 2007 ; Toronto, Canada
01.01.2007
11 pages
Also known as RETC. Held on CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3
British Library Conference Proceedings | 2007
|The Construction of the Manhattan Water Tunnel, New York City
British Library Conference Proceedings | 2008
|Manhattan Shaft, New York City Water Tunnel No. 3
British Library Conference Proceedings | 1997
|The Manhattan valley viaduct, New York city
Engineering Index Backfile | 1899
The Manhattan Life Building in New York city and its quick construction
Engineering Index Backfile | 1895
|