Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Replacing US railroad bridges within hours, a.k.a Change Outs "Railroad Bridge Change-outs"
Replacing US railroad bridges within hours, a.k.a Change Outs "Railroad Bridge Change-outs"
Replacing US railroad bridges within hours, a.k.a Change Outs "Railroad Bridge Change-outs"
IABSE symposium; Improving infrastructure worldwide: report ; 2007 ; Weimar, Germany
01.01.2007
2 pages
Includes 1 CD-ROM attached to inside back cover. Includes bibliographical references.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 1997
Hang-outs, Look-outs and Wipe-outs
Online Contents | 1994
|Rapid process for replacing metallic railroad bridges
Engineering Index Backfile | 1929
Bridge floors for railroad bridges
Engineering Index Backfile | 1883
|British Library Online Contents | 2011
|